by SFM_IanD | Jan 23, 2018
PROJECT:
Repair waterproofing on the roof of the ANZ building in Lismore.
PROBLEM:
The ANZ building in Lismore was leaking and in urgent need of repair. CIW Remedial commenced work on rectifying the leaks to the roof without the need to close the building and disturb staff and customers.
SOLUTION:
Our Wetsuit membrane was used to rectify the problem. The roof was sprayed and detailed quickly and efficiently by our team.
by SFM_IanD | Jan 22, 2018
Heritage Listed Fire Station
PROJECT:
Ignite Studio, Ballina, NSW
PROBLEM:
The beautiful, heritage listed premises were previously used as a Fire Station for approximately 80 years. The Ballina Fire Station operations relocated to new premises in 2015 and the former Ballina Fire Station at 60 Crane Street was then acquired by Ballina Shire Council. Refurbishment works were carried out during 2018 for the adaptive re-use of the premises as a regional multi-disciplinary art space, celebrating the heritage values of the building and ongoing enjoyment of the facility for the whole community. The heritage Fire Station was experiencing water ingress. Our project was to stop the ground water ingress into the historic engine pit preventing further damage for display purposes.
SOLUTION:
We injected the perimeter of the engine pit joints with a hydrophilic Polyurethane Waterstop.
by SFM_IanD | Mar 28, 2014
Thomas Dixon Dance Centre Brisbane
PROJECT:
Protect heritage listed building from corrosive salts
PROBLEM:
Agressive salt attack to the internal face of the brick wall to this heritage listed building. The client required the rectification works be done without any physical damage to the existing brick surface.
SOLUTION:
Westox Cocoon desalination system was used as it provided a non-destructive solution to the problem.
by SFM_IanD | Mar 28, 2011
Remediation Works To Heritage Listed Building
Location: 133 Commercial Rd, Teneriffe, Brisbane.
CIW Remedial were engaged by the Dunavant Group USA to undertake the following remedial repairs prior to sale.
- Salt effected brick work was desalinated, reconstructed and colour matched to the existing facade.
- Concrete cancer repairs done to all window heads.
- Rising damp injection to external walls.
- Roof and parapet waterproofing membrane replacement.
- UV stable clear penetrating sealer was applied to the entire facade surface.
All works were completed in time and under strict supervision of consulting engineers to insure Heritage Building compliance.
Reference for this project is available on request.
by SFM_IanD | Mar 28, 2008